Operations



TSX PTA.V

Last Trade 0.28 CAD | Change +0.005

Trade Time 12:27pm EST Yahoo

Volume 87881

PTA Operations

Llanos Basin Highlights View The Current Operations Petroamerica

Operations Map - Llanos Basin Highlights

2013 Activity Catalysts

  • Balay Development
  • Las Maracas production and appraisal drilling
  • El Eden La Casona testing

Operations Map - Llanos Basin Highlights

Los Ocarros

  • Las Maracas-2ST Mirador discovery producing
  • Las Maracas-3 Gacheta discovery producing
  • Las Maracas-4 Gacheta appraisal producing
  • Las Maracas-5 Gacheta appraisal producing
  • Las Maracas-6 Gacheta appraisal producing
  • Las Maracas-7 Gacheta appraisal producing
  • Las Maracas-8 Mirador appraisal producing
  • Las Maracas-9 spud April 15, 2013
  • Las Maracas-13 completed and tested as a water injector
  • Permanent production facility on schedule for completion end of May, 2013
  • La Guira-1 exploration well & 3D seismic program in 2013

Operations Map - Llanos Basin Highlights

Balay

  • Balay commerciality declared March, 2012
  • Balay-4 Mirador development well producing
  • 2013, convert Balay-3 to a water injection well
  • 2013, possible drill up to 2 additional development wells and construct permanent facilities

Operations Map - Llanos Basin Highlights

CPO-1

  • On-trend with prolific Caracara fields
  • Multiple leads identified from 2D seismic
  • Altillo Oeste-1 was plugged and abandoned

Operations Map - Llanos Basin Highlights

El Eden

  • Entire block covered by 3D seismic.
  • La Casona-1 discovery production expected Q3 2013
  • Another prospect on trend with Ramiriqui discovery identified

Operations Map - Llanos Basin Highlights

El Porton

  • Block covered by 3D seismic.
  • Calatea-1 well encountered good hydrocarbon shows and logs indicated oil zone in the Une. Option for future re-entry
  • One exploration well, Curiara-1, on trend with Ramiriqui discovery, was spud February 14, 2013
  • Multiple prospects identified by 3D seismic for future exploration

Operations Map - Llanos Basin Highlights

LLA-10

  • Area last explored more than 20 years ago
  • 230 km2 of 3D seismic acquired and interpreted
  • Multiple leads and prospects mapped
  • Malavar-1 prospect expected to be drilled 2013