Operations
TSX PTA.V
Last Trade 0.28 CAD | Change +0.005 
Volume 87881
PTA Operations
Llanos Basin Highlights View The Current Operations 
2013 Activity Catalysts
- Balay Development
- Las Maracas production and appraisal drilling
- El Eden La Casona testing
Los Ocarros
- Las Maracas-2ST Mirador discovery producing
- Las Maracas-3 Gacheta discovery producing
- Las Maracas-4 Gacheta appraisal producing
- Las Maracas-5 Gacheta appraisal producing
- Las Maracas-6 Gacheta appraisal producing
- Las Maracas-7 Gacheta appraisal producing
- Las Maracas-8 Mirador appraisal producing
- Las Maracas-9 spud April 15, 2013
- Las Maracas-13 completed and tested as a water injector
- Permanent production facility on schedule for completion end of May, 2013
- La Guira-1 exploration well & 3D seismic program in 2013
Balay
- Balay commerciality declared March, 2012
- Balay-4 Mirador development well producing
- 2013, convert Balay-3 to a water injection well
- 2013, possible drill up to 2 additional development wells and construct permanent facilities
CPO-1
- On-trend with prolific Caracara fields
- Multiple leads identified from 2D seismic
- Altillo Oeste-1 was plugged and abandoned
El Eden
- Entire block covered by 3D seismic.
- La Casona-1 discovery production expected Q3 2013
- Another prospect on trend with Ramiriqui discovery identified
El Porton
- Block covered by 3D seismic.
- Calatea-1 well encountered good hydrocarbon shows and logs indicated oil zone in the Une. Option for future re-entry
- One exploration well, Curiara-1, on trend with Ramiriqui discovery, was spud February 14, 2013
- Multiple prospects identified by 3D seismic for future exploration